Ferroman has been awarded with a contract by SSAB to provide a second closed cooling-water system. Ferroman will provide the system as an EPC including all engineering, main equipment, tie-ins and piping, as well as associated equipment and installation work. The scope also covers EPC interface management. The works starts immediately with delivery scheduled during first quarter 2023.

“We are pleased to be selected to execute this green-field project. We look forward to extending our long-standing relationship with SSAB”
— Håvard Hansen, CEO Ferroman Engineering.
Sustainable production
Powered by digital technology, strategic partnerships and a strong culture of solving problems, we deliver complex Turn-key projects in a safe, predictable and sustainable way.
The ability to gain insight and value from centralized data is critical to effectively managing and optimizing work processes. We provide our customers a range of propriety systems and intelligent analytics for inspection and integrity management for collaborative work process integration, optimization and data visualization. These provide our customers with full access to their assets data, current condition and performance while providing a comprehensive framework to effectively plan, report and support overall improvement.
Related News
March 13, 2026
HeatBox – Rapid and cost-efficient electrification
HeatBox enables fast and cost-efficient electrification of heating processes.…
February 18, 2026
Ferroman Element Guard – Reducing unexpected furnance downtime
Ferroman Element Guard supports predictive monitoring of heating element…
February 12, 2026
PEAK SHAVING – How it works
Ferroman Peak Shaving is an AI-driven industrial load control system designed…